Total Pageviews
Tuesday, 26 July 2011
It's finally flipped and stuck together
More pics arrived today and the two bits are now together and work to smooth the underside in hand.
That's the underside of the deck showing the inserts and deck moulding for the racks and fittings
Same thing from another angle
The internals, the centreboard case and bulkheads to reinforce the hull.
Couple of shots of its raw state out of the mould frames...
Prior to sanding.
Next step is to rub and fair the surface
Prior to filling and painting.
Clearly quite a lot of work, these stages which took most of last week.
It is however taking shape, and looking remarkably like the original plans and CAD programmes which although expected, is surprising nonetheless and very assuring.
Looking at the shot of the bow and these stern sections, it looks fully capable of taking what the sea is going to chuck at it. That nose lift should deal with anything and the stern flats look well capable of fast planing, it is a beast, I certainly won't be naming it after anything floral that's for sure..
Monday, 18 July 2011
Coming Together

Anyway this is another exciting update, it's been tricky sorting all the fixing points and making certain that the swinging pole swivel works and that the racks won't dig in. They're a little wider than I'd first planned, but that is due at the moment to the expediency of using B14 bits I'm going to guess.

You can see the preparations for the internals and the raising points of the racks and the whole craft is beginning to look a whole lot more racier, it's definitely going to have enough righting moment for my weight, which at the end of the day was the whole deal.

I can see this thing maybe being able to be sailed flat and bang the corners planing like a Formula Board on certain types of water. I can't wait to get on it, with any luck we may even be getting it wet this weekend according to Jamie, although I must admit it doesn't even look close, but then he knows what he's doing.
Saturday, 18 June 2011
Saw the two bits together for the first time today, which confirmed just how big she is, but it's exactly the parameters I want, long waterline so she'll go upwind just fine, and wide so she'll be stable.So today was all about decisions, poles, kites, jib, mast position, tillers, centreboards, racks, obviously to prepare the fixing positions for shrouds, mastfeet etc.
We're basing our dimensions on what's going to be a bit of a cross between an RS700 & 800, we're going to definitely go with a wing-wang, a jib boom with a furler, the pump system to hoist the kite and a mix of the fittings of those two boats, the hull itself is already radical enough to best to go with tried systems initially to make it go.

The stern, we've decided to go with carbon racks centred at 1.50m each given 3.00mtrs width and righting moment which should be more than enough to keep her as upright as she needs to be and able to fly a hull. So to prevent the racks digging in they'll need to be set into the deck and wedged.

The centreboard case is going to be and extended plated similar to the RS200, it'll need to be longer to compensate for the tunnel height and high aspect ratio so will extended pretty much the entire length of the tunnel, the case is built already and we've allowed for pivot positions so I can bring the mast back even further if necessary.
It still looks like it could be a potential twin handed thing, but we're still going for the original concept, it'll have a fairly long tiller extension , we had a lot of discussion about twin rudders, twin tiller extensions off one rudder, for or aft sheeting, off boom or centred, but given the jib and the need for the main to be centre sheeted, we've opted for conventional centre sheet bridled and the jib and main connected, we're also considering a jib pole to facilitate goose winging the jib for the odd occasion when running with the kite isn't feasible.
I'm going to settle for two sail sizes, one as big as I dare for light to medium, we may as well go for broke, see just how fast we can make it go, and a smaller main for breezy conditions.
So with any luck next time I see it, she'll be together and maybe even on the water..
Friday, 10 June 2011
More Progress
Wednesday, 8 June 2011
Taking shape at last
It seems ages since I last had anything to update with and time seems to be flying by, but this month things should start to accellerate, now we have the deck and hull bits 'planked' and glassed.
I'm stuck in a sales meeting in France right now and the last month or so seems to have been an endless round of travels and new product launches so the jolly old v-twin has been a bit on the back burner. I've sold my RS100 just this week so now I'm single handed boat less, this will focus me a bit more.
One thing that's worrying me as she comes together is the sheer size of her, looks more like a radical two hander than something I'm going to be able to launch and recover alone, she's a big old girl.
Wednesday, 27 April 2011
April 27th
So today, after much procrastination and a couple of delays, I finally got to see the ribs laid out on the floor of the builders.
The Hull Layout.
Straight edge to check the rocker.

Laser cut MDF sheets, they are spaced a fw inches apart and the foam strips will be laid into them, then glassed on the inside, then flipped and the external surface glassed, not sure wether to use carbon yet, it's a tough decision, it's very expensive when the hull isn't exactly tried and proven.
The Deck Mould
They've altered the original spec to reduce the wetted surface and to encourage the hull to heel and fly one side up wind, it'll be interesting sailing something deliberately designed to heel, I can do that bit well enough, although I had hopes it could also sail flat and plane should the water conditions permit, i.e. flat estuary stuff or offshore wind where I sail.
Thursday, 3 February 2011
V2-V-Twin Project
Having come to the gentile art of dinghy sailing relatively late in the day, I find it has followed a course of action not unlike that of another sport dear to my heart, Windsurfing.
Basically most of the exciting fast stuff becomes next to near impossible to sail by someone with the level of work commitments and perhaps the deteriorating motor skills bought on by the decay of years. Fast boats are over canvassed slim skiffs that fall over if no-one is inside them to mind whats going on. They fall over even more, with people inside them, even if they do mind what's going on, especially when its windy or in challenging sea conditions, to the point even the finest of Gold Medal Olympic atheletes are at a loss to control them as witnessed in the Olympic medal race at Beijing.
So having once more purchased what I thought would be the answer in the shape of a super new boat the RS100 only to find it needed the level of skills possessed by an ex Olympic Squad member in order to suceed at, I decided there must be an easier way, and I'm hoping the answer will be the final result of this blog which will record my progress in fabricating new style racing dinghy.
I christened it initially the V2 as a latter day version of a dinghy known as the Vortex which due to its narrow nose and multiple daggerboards I'm tempted by but find unsuitable to the beach and sea condition I sail from at Hythe in Kent, but have since renamed, due to the V shaped hull which flows into twin aft planing sections and it is now called..
The V-Twin.
The illustrations on the left are renders from a CAD programme drawn up by Dan Holman who works for a company called Synthesize Yachts and Design.I'd drawn sketches of my requirements, which is for a fast stable boat capable of being launched from our infamous shore dump at Hythe, safely.
I don't want a Cat, they're difficult to right if they go over, don't tack well so not really suitable to close quarter tactical sailing using shifts etc that I enjoy, so the answer seemed to me to try and produce a cross between a Cat and a Mono but using some of the expertise I've learned over the years from assisting in the design and production of racing long windsurfing boards.
Having spent a day down at Synthesize and absolutely amazed at the capabilities of modern computer programmes and their ability once rendered to predict planing, wetted surface, plot attitude and generate a feasible model prior to production. I agreed to generate the inital design and move on to get quotes to mill a blank ro build the first prototype.
Hythe on a relatively benign day.
The design calls for three stage rocker, a 'rocker' being the varied angle of attack of the planing surfaces of the hull presented to the water. Most dinghies seem to have a progressive rocker, because primarily they are 'displacement' rather than 'planing' hulls. Or, more recently there has been a trend to straight rockered 'skiffs' that are designed to plane on rather than displace water, they use Assymetric rigs and emulate windsurfing techniques of planing at angles downwind rather than directly toward a mark by using their greater speed which generates apparent wind to progressively sail further and further offwind.
However when the windspeed is not great enough for them to work this way, they are inevitable sluggish due to the high area of wetted surface always present when no dynamic lift from motion is present. These hulls we also found in racing longboards with similar rockers, whilst good on flat water are slow to plane in sizeable waves and at certain wave angles promote a downward trajectory into the back of the next wave with sometimes dramatic results as the boat slows down or stops quickly and in some instances pitch poles stern over bow.
So having a rocker with three distinct 'sections' at each level altering the nose attitude whilst reducing contact with the surface presented by the previous section as the boat planes, assists this problem. The challenge was to work out the area, volume, hull width at key points in order to brief the designer, so I simply used what we already knew from long windsurfing boards, the result of which the two rear sections emulate two windsurf boards side by side.
Subscribe to:
Posts (Atom)
